Scroll left
  • The cabling on the wall nears completion original:knapp_cabling.JPG;;width:540;;height:720
  • A view downwards from a platform original:ritter_downfromplatform.JPG;;width:720;;height:540
  • The PMT HV cables in the control room original:ritter_cabletree.JPG;;width:540;;height:720
  • The testing setup of the PMTs original:ritter_pmttest.JPG;;width:720;;height:540
  • Installing a diffuser ball original:knapp_dballinstall.JPG;;width:540;;height:720
  • The diffuser ball is in place original:ritter_diffuserballinplace.JPG;;width:540;;height:720
  • Work in the pillbox original:stoessle_insidepillbox.JPG;;width:720;;height:540
  • The pillbox is covered with reflective foil as well original:freund_pillboxvm.JPG;;width:720;;height:540
  • A PMT opening in the wall of the pillbox original:knapp_pillboxpmhole.JPG;;width:720;;height:540
  • The pillbox is almost done original:knapp_pillboxwork.JPG;;width:720;;height:540
  • View into the finished pillbox original:knapp_stefano.JPG;;width:720;;height:540
  • The top of the cryostat is covered original:meierhofer_topofthecryo.JPG;;width:720;;height:540
  • original:meierhofer_topofthecryo2.JPG;;width:720;;height:540
  • The top is almost done original:ritter_topofcryo.JPG;;width:720;;height:540
  • The cryostat is covered with a layer of insulating material, which is glued onto the steel original:freund_jackodurprep.JPG;;width:540;;height:720
  • The tank is almost covered original:knapp_jackoncryo.JPG;;width:720;;height:540
  • The covering procedure seen in the reflection from the top of the cryostat original:meierhofer_installjackodur.JPG;;width:720;;height:540
  • The last pieces are glued onto the cryostat original:freund_installjack.JPG;;width:720;;height:540
  • original:meierhofer_cryolilac.JPG;;width:720;;height:540
  • original:meierhofer_topinlilac.JPG;;width:720;;height:540
  • In addition the insulation is fixed with plastic bands original:knapp_jackdone.JPG;;width:540;;height:720
  • The cryo is covered with reflective foil original:knapp_vmonjack.JPG;;width:540;;height:720
  • original:knapp_vmonjack2.JPG;;width:540;;height:720
  • The last length of foil original:knapp_lastvmmissing.JPG;;width:540;;height:720
  • The very last lenght of foil, with additional glue original:knapp_vmglue.JPG;;width:540;;height:720
  • original:ritter_cryotopdone.JPG;;width:720;;height:540
  • The hoisting platforms are moved out of the tank original:freund_hoitout.JPG;;width:720;;height:540
  • Fitting neatly original:freund_hoitout2.JPG;;width:540;;height:720
  • The floor is covered with foil original:freund_flooralmostdone.JPG;;width:720;;height:540
  • original:meierhofer_floordone.JPG;;width:720;;height:540
  • The last piece of covering is removed original:freund_lastfloor.JPG;;width:720;;height:540
  • original:freund_floorflash.JPG;;width:720;;height:540
  • original:freund_floornoflash.JPG;;width:720;;height:540
  • original:freund_reflec.JPG;;width:720;;height:540
  • original:meierhofer_sparkle.JPG;;width:540;;height:720
  • original:meierhofer_guarding.JPG;;width:720;;height:540
  • A view of the manhole original:freund_inmanhole.JPG;;width:540;;height:720
  • View from the chimney into the tank original:knapp_fromchimney.JPG;;width:720;;height:540
  • The proud mastermind behind the muon veto original:knapp_knapp.JPG;;width:540;;height:720
  • The team of the third installation (left to right) standing: Georg Meierhofer, Markus Knapp, Florian Ritter, Kai Freund. Sitting: Aileen Buchmann, Florian Jetter, Kevin Schaal, Fedor Simkovic (Not on the photo: Achim Stoessl) original:knapp_team.JPG;;width:720;;height:540
  • We had some reflective foil left original:meierhofer_gerda.JPG;;width:720;;height:540
Scroll right