  • The second installation session: cables and more cables original:freund_mostpmtdone.JPG;;width:720;;height:540
  • Checking for damage after the earthquake original:freund_checkingpmt.JPG;;width:720;;height:540
  • Slightly oily screws are covered with glue original:meierhofer_pmtglue.JPG;;width:540;;height:720
  • This one is done! original:knapp_tick.JPG;;width:540;;height:720
  • Photomultipliers await their installation original:greiner_pmtready.JPG;;width:720;;height:540
  • More cables are lead through to the chimney original:greiner_pmtinstallation.JPG;;width:540;;height:720
  • A diffuser ball: the water tank can be homogenously illuminated with these balls, in order to check the PMTs' functionality and for low level calibration original:ritter_diffuserball.jpg;;width:720;;height:540
  • Each PMT has also an optical fibre attached... original:ritter_fibers.jpg;;width:720;;height:540
  • ... which need to be bundled... original:ritter_fibreprep.jpg;;width:720;;height:540
  • ... and attached to every PMT so that it can be calibrated with a light source. original:ritter_fibreoptic.jpg;;width:720;;height:540
  • The bottom PMTs are mostly in place original:ritter_pmtinplace.jpg;;width:720;;height:540
  • The cables still need to be sorted original:meierhofer_cableplanning.JPG;;width:540;;height:720
  • original:ritter_cables.jpg;;width:720;;height:540
  • An installed PMT with its reflection original:knapp_vmreflec.JPG;;width:720;;height:540
  • The lead-through flanges on top of the water tank original:ritter_flange.jpg;;width:720;;height:540
  • Work in the tent around the flanges original:freund_chimneytent.JPG;;width:540;;height:720
  • Another cable is coming up original:freund_comingup2.JPG;;width:720;;height:540
  • The chimney is getting crowded original:freund_innerchimney.JPG;;width:720;;height:540
  • But more are coming original:freund_comingup.JPG;;width:720;;height:540
  • The HV cable of the PMT original:freund_hvcable.JPG;;width:540;;height:720
  • The first insulating layer is added to the bottom of the cryostat original:meierhofer_jackodur.JPG;;width:720;;height:540
  • The team of the secon installation (from left to right): Kai Freund, Florian Ritter, Tina Oexl, Georg Meierhofer, Markus Roehling, Markus Knapp and Daniel Greiner (shooting this photo) original:greiner_team.JPG;;width:720;;height:540